Filter Plant Retention Pond Upgrade

PWS are currently completing a significant upgrade to a West Coast Mining Filter Plant retention ponds by creating diversion drains and installation / commissioning of pumping infrastructure to improve its containment. The works include:

  • Installation of various concrete slabs and pumping infrastructure mounts.
  • Installation of two storm water pumps.
  • Installation of two pump priming tanks, leaf strainers, flowmeters and vortex breakers.
  • Fabrication and installation of all pipework, valves, fittings, and supports associated with the pump station.
  • Installation of a new pipeline to and from the pump station
  • Rehabilitation of existing pipeline (1,000 m length).
  • Cut and fill existing drain to suit new drain layout (135 m length).
  • Commissioning and hydrostatic pressure testing